Home  >  CLEANROOM EQUIPMENT  >  Modular Cleanroom  >  Modular Cleanroom Construction
Modular Cleanroom Construction

Modular Cleanroom Construction

Brand
HAOAIRTECH
Model number
HA-LFB
Material
Steel with power coated
OEM /ODM
OEM/ODM
Certificated
CE
Start port
GUANGZHOU
Delivery time
10 working days after we get the deposite
MOQ
1sets
Country of Original
China
Supply ability
100set/month
Payment term
100%T/T in advance ,100% LC at sight against with document
Application
Semiconductor cleanroom
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Name: Modular Cleanroom
Other Name: Cleanroom Construction
Guarantee Time: 12 months
Purificaiton Rank: ISO7/ISO8
Dimension: Customized
Power Supplier: 220V/50HZ OR 60HZ

Modular Cleanroom Construction 


   Provides Controlled Environment

      Haoairtech  Hardwall Cleanroom Wall Panels and Components are engineered to provide a secure controlled environment within the cleanroom.

  Ultra-smooth surface wall panels, framing and ceiling components assure consistent pressure in the cleanroom and constant control of air-born particles. As a result, Cleanroom Systems achieve very high cleanroom performance standards.

      Non-Progressive Design

     The Haoairtech wall panel and framing modular design reduces lead time which assures that the cleanroom is in operation ontime and within budget. As needs change in the future,  haoairtech wall panel modular design offers the ability to relocate or expand the cleanroom in the future.

      Special Sizes

    Haoairtech wall panel composition and the modular panel construction fulfills requirements for any hardwall cleanroom design and layout. Wall panels can be made in special sizes for entry areas, gowning rooms and air-locks, 

     ensuring that the cleanroom pressure remains constant. Extra-high Legend wall panel systems can accommodate large equipment which require ceilings higher than the standard eight (8) feet.

     Load Considerations

    Three factors are considered when determining which wall system to use for load-bearing cleanrooms.

 The first factor is the amount of total weight on the cleanroom wall,

 the second factor is the span distance between all four (4) of the cleanroom walls and the third factor is the height of the wall. 

  Consult with the factory for detailed information about your cleanroom project.

   

Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...